Roadmap
-
Shelf manager detailed specification to be communicated to HI designer,
-
rewriting the zpt files so as to generate the pot files.
-
improving the import script of Rakesh and connecting it to the knowledge base.
-
uploading and organizing different kinds of files such as image, audio, video, pdf, odf, html, etc. and a form specification for license and other metadata.
-
uploading files, selecting a file, and selecting an area of a file, adding title, description, multiple session facility,
-
as per Niyam's suggestions, with other auxilliary items like tests, glossary, links, faq etc. resizing the panel width,
-
Milestone: HI design for Shelf Manager
1 year late (10/04/2007)
following the specifications the HID provides the drawing
-
like moodle, atutor, sakai, dockeOS for interoperability with SCORM format. 1.2 to 2004 version.
-
Milestone: version control UI design
1 year late (10/04/2007)
version control dots on the UI, showing differences, and history as a tree with branches
-
Wrapper between gnowQL and gnowsys-pg with version control.
-
Milestone: File Manager UI Drawing
1 year late (10/15/2007)
viewing the list of files across users, add to shelf, date, uploaded by, size, format,
-
Milestone: Search results UI drawing
1 year late (10/19/2007)
page design for search results
-
Milestone: Tested and implemented vcs and postgres
1 year late (10/19/2007)
completing the testing and migrating self-platform to the postgres with version control.
-
Milestone: implementing the SHELF Management
1 year late (10/19/2007)
as per the specification and drawing
-
Milestone: 118n for 7 + n languages
1 year late (10/25/2007)
each partner of the SELF project does for at least one language: dutch, english, spanish, catalan, german, swedish, bulgarian, hindi, marathi, portuguese, french,
-
Milestone: Atomizer UI Drawing
1 year late (10/25/2007)
based on the specification provided, and the prototype atomizer made.
-
Milestone: export DocBook, HTML, PDF, ODF
1 year late (10/25/2007)
exporting the courses in DocBook?, Html, PDF, ODF, in that order of priority
-
Milestone: implementing the Search results page
1 year late (10/25/2007)
result page implementation as per the drawing
-
Milestone: the vc UI on the system implemented
1 year late (10/25/2007)
adding the version dots, differences between versions and the history as a tree, as per the HI drawings
-
Based on the relations and attributes already available in the gnowledge.org portal (as released in the gnoware.org dvd) write a Python script that generates and stores questions automatically. Generate an interface to view the questions.
-
Milestone: File Manager Implementation
1 year late (11/08/2007)
as per the specification and drawing
-
gnowsys 9.0 will use postgres as storage with full version control system. 9.0 will be the first release candidate that will include functionality for storing and retrieving metatype, objecttype, attributetype, relationtype, object, attribute and relations.
0.9.1 will be the development version hwen, process typpe, process, and procedural types will be implemented. and bugs in 0.9.1 will be fixed. 0.9.2 will be the release candicate with all the procedural functions included.
